Why Seismic Upgrades Matter
In the Bay Area, building movement from daily micro-tremors and traffic loads slowly loosens anchors, fatigues welds, and opens gaps at beam-column joints. A proactive steel upgrade reduces drift, protects tenants, and keeps your facility compliant with local ordinances—without shutting operations down for weeks.
The Three Most Common Steel Solutions
1) Special Moment Frames (SMF)
Adds lateral stiffness while preserving open floor plans.
Welded beam-to-column connections with tested details; field welding may be limited to tie-ins.
Best for: Retail fronts, garages with long bays, and lobbies that must stay open.
2) Buckling-Restrained Braced Frames (BRBF)
High energy dissipation with predictable yielding.
Slimmer members vs. conventional bracing; cleaner architecture.
Best for: Multi-family podiums, medical, schools needing tight drift limits.
3) Steel Collectors + Shear Connections
Upgrades to clip angles, end plates, and continuity plates to transfer diaphragm forces.
Often paired with epoxy anchors or new base plates.
Best for: Older tilt-ups, mezzanines, rooftop units, and stair cores.
Typical Scope We Deliver (Start to Finish)
Site walk & rapid assessment – Verify spans, slab thickness, obstructions, utilities.
Engineer-of-Record coordination – Shop drawings, connection schedules, anchor calcs.
Fabrication – W-beams, HSS braces, gussets, continuity plates, base plates; mill certs attached.
Surface prep & finish – Shop prime, galvanize for exterior, or field coat touch-ups.
Installation – Night/weekend work available; dust/paint containment; spark protection.
QC & closeout – Weld maps, WPS/PQR on request, bolt tension logs, as-builts, photo report.
Scheduling & Lead Time (What to Expect)
Assessment + submittals: 1–2 weeks (faster if drawings are clean and access is clear).
Fabrication: 1–3 weeks depending on member sizes, finish, and galvanizing.
Install: 2–7 days for small bays or single frames; phased so tenants keep operating.
Pro tip: Approve finishes and anchor brands early to avoid re-submittals and backorders.
Anchors, Welding, and Inspection—Practical Notes
Anchorage: Choose between mechanical expansion, screw anchors, or adhesive with proper edge distance; verify slab thickness and rebar with scanning.
Field welding: Use certified welders (AWS D1.1/D1.8 as applicable); protect fire alarms, sprinklers, and finishes; plan temporary shoring if required.
Inspection: Coordinate special inspections for hold-downs, bolts, welds, and epoxy. Keep an inspection calendar to avoid failed visits.
Finish Options by Exposure
Interior: Shop prime + field touch-up.
Exterior/coastal: Hot-dip galvanize; consider duplex (galvanize + powder coat) for long life.
Stainless (304/316): Use where corrosion or sanitation is critical; always passivate after fabrication.
Budget Ranges (Ballpark Only)
Minor collector/clip upgrades: $$ – lower cost, fast install.
Single bay moment frame or BRBF: $$$ – mid-range with higher engineering and inspection needs.
Multi-bay phased retrofit: $$$$ – plan for night work, traffic control, and tenant coordination.
(We’ll price per pound + connection complexity once we review drawings and site conditions.)
Facility Manager Checklist
Structural and architectural PDFs (native if possible).
Access plan (hours, loading dock, ceiling heights, crane/picker location).
Fire-watch requirements and hot-work permits.
Finish standards (paint codes, galvanize notes).
Preferred anchor brands or equal.